Nike Communications

Architect:

Space Architects

General contracting services for this corporate interior fit-out included an ACME metal and glass partition system for the exterior offices, allowing for a lighter and more open feeling throughout the public space. The partitions required an alteration to wood floors, which were subsequently repaired, sanded and refinished with a gloss polyurethane finish. A new air handler was installed and tied to the base building-cooling system, requiring new piping and control wiring between the two. The base building tower was eight stories above the client’s floor.

nike_02

Image 1 of 2